In order to expand the global capacity for animal vaccine production, additional production/logistics areas were created at the site in the existing production building. A new logistics building with a usable area of ​​4,100 m² was built for the delivery and storage of goods, as well as for their inspection, weighing and sampling.

A clean room zone for the production of bacterial antigens was built on an area of ​​2,000 m² in the production building. (Clean room class ISO 7 or BSL 2). A further clean room zone was created on an area of ​​2,500 m² for final formulation, filling and outgoing goods inspection. Filling takes place under aseptic conditions within a RABS and complies with the requirements of an ISO 5 classification.

Client:
VTU Engineering GmbH
Architect :
ATP Planungs- und Beteiligungs AG
Scope of services:
planning, site supervision and commissioning MEP
Execution period:
2018 – 2021
Total air volume:
550.000 m³/h
Heating capacity:
4.000 kW
Cooling capacity:
7.700 kW
Cold storage:
230 kW
Amount of steam:
12.000 kg/h
Compressed air volume:
2.200 Nm³/h
Neutralization :
17,5 m³/h
I&C data points:
9.000
Electrical power:
5.000 kW